|
Post by iraq business news on Mar 8, 2014 13:58:38 GMT
Gazprom Neft has completed laying, testing and connecting a 165 km oil pipeline from the Badra field, which the Company operates in Iraq, to the Gharraf oilfield (Nasiriyah district, Iraq).
With infrastructure already in place at Gharraf, completion of the pipeline from Badra means that the field is now connected to the main Iraqi pipeline system.
The new infrastructure for transporting raw materials from Badra has the capacity to transport 204,000 barrels per day, around 10 million tonnes per year, and can now supply oil to the export terminal at the city of Basra.
|
|